Retain, repair or replace · Dulwich
Kitchen renovation in Dulwich
Design-led: we plan the room before we price the work, so the drawing and the build match.
Build-led: our own builders, plumbers and electricians on site, one team from strip-out to finish.
A worn room does not always need everything replaced.Our kitchen renovation in Dulwich starts with its condition, then the changes you want to make.
SE21 · SE22 · SE24 · SE27 · Southwark
Assess the existing room
Kitchen renovation in Dulwich: where to start
In a larger kitchen, compare replacing doors and worktops with renewing the whole room.
Check whether the old service positions still suit the household.
Keep work to a structural opening separate from replacing worn finishes.
Bring photographs of problem areas as well as ideas for the finished room.Leaks and damaged surfaces belong in the first brief.
Compare a partial refresh with a full refit.List the repairs and service changes under each option.
Make it buildable
Repairs and replacement in Dulwich
Make a retain, repair and replace list before agreeing the scope.
Mark any unknowns that can only be checked after strip-out.
Agree how extra repairs will be discussed before they proceed.
The sequence should resolve hidden defects before new fittings, surfaces and decoration go in.
The local check
What changes from one property to another
Much of Dulwich sits under the Dulwich Estate's Scheme of Management.
It is a second consent on top of planning permission.
Freeholders need a licence from the Estate before any structural change or anything that alters the outside.
That includes removing an internal wall, replacing windows and fitting a boiler flue.
Replacing kitchen units on their own does not need it; knocking the kitchen through to the dining room does.
The Estate's own guidance puts rear extensions at around 3m from the rear wall and 3m high to a flat-roof parapet.
It asks for a 600mm offset from a shared boundary unless your neighbour agrees in writing.
We check the actual address and the proposed work before saying what consent is needed.
Check the rules for your address
These are the local authority and estate sources relevant to Dulwich.
Before work begins
Build a clear refurbishment brief
Keep the visible replacement separate from the repairs that make the room usable for the long term.
- Record existing leaks, damp and damaged finishes.Agree what needs investigation before selecting replacements.
- List what stays and who checks its condition.Retained appliances and fittings still need to suit the new arrangement.
- Identify changes to walls, service routes and outside openings.Check the proposed scope against the property and tenure.
- Agree the work sequence, temporary facilities and delivery access.Plan when the room will be out of use.
- Keep a written record of discoveries after strip-out.Discuss changes to scope before additional repairs proceed.
From our work
A closer look at our work
Finished details from our own work.Discuss which materials, storage and finishes would suit your refit.



Talk it through
Start with a call, then a site visit if it helps.
Tell us the postcode, the room's condition and what you want to keep or change.Start with a call about the scope.
Keep exploring
Related work nearby
Further reading
The regulations: the official guidance
- Planning Portal: Kitchens and bathrooms: when Building Regulations approval is needed
A straightforward refit does not generally need approval, but drainage or electrical work may.A new kitchen or bathroom in another room is likely to need it.
- Planning Portal: Internal walls
Taking out an internal wall rarely needs planning permission, but structural work needs Building Regulations approval.
- GOV.UK: Electrical safety: Approved Document P
The Building Regulations guidance on electrical safety in homes, including special locations such as bathrooms.
- GOV.UK: Ventilation: Approved Document F
The Building Regulations guidance on ventilation, including extraction from kitchens and bathrooms.
- Planning Portal: Extensions
When a rear or side extension can go ahead under permitted development, and when it needs permission.
- Historic England: A guide for owners of listed buildings
Making changes to a listed home, with sections on kitchens, bathrooms, extensions and windows.
