Retain, repair or replace · Crystal Palace

Kitchen renovation in Crystal Palace

Design-led: we plan the room before we price the work, so the drawing and the build match.

Build-led: our own builders, plumbers and electricians on site, one team from strip-out to finish.

A worn room does not always need everything replaced.Our kitchen renovation in Crystal Palace starts with its condition, then the changes you want to make.

BR3 · SE19 · SE20 · SW16 · Southwark, Lambeth, Lewisham, Bromley and Croydon

Assess the existing room

Kitchen renovation in Crystal Palace: where to start

In a room above or below garden level, investigate damp and floor condition before replacing cabinets.

Check how a new floor finish meets the steps and outside threshold.

Plan deliveries and waste removal around the actual carrying route.

Bring photographs of problem areas as well as ideas for the finished room.Leaks and damaged surfaces belong in the first brief.

Compare a partial refresh with a full refit.List the repairs and service changes under each option.

Make it buildable

Repairs and replacement in Crystal Palace

Make a retain, repair and replace list before agreeing the scope.

Mark any unknowns that can only be checked after strip-out.

Agree how extra repairs will be discussed before they proceed.

The sequence should resolve hidden defects before new fittings, surfaces and decoration go in.

The local check

What changes from one property to another

Five boroughs meet here, so the first job on any application is establishing whose rules apply to your address.

Much of this area is a conservation area, which removes permitted development rights that apply elsewhere.

Windows, doors, roofs and front gardens come into the application.

Each conservation area has its own appraisal of the materials the council considers appropriate.

They differ, so the answer on one street is not the answer on the next.

We check the actual address and the proposed work before saying what consent is needed.

Before work begins

Build a clear refurbishment brief

Keep the visible replacement separate from the repairs that make the room usable for the long term.

  • Record existing leaks, damp and damaged finishes.Agree what needs investigation before selecting replacements.
  • List what stays and who checks its condition.Retained appliances and fittings still need to suit the new arrangement.
  • Identify changes to walls, service routes and outside openings.Check the proposed scope against the property and tenure.
  • Agree the work sequence, temporary facilities and delivery access.Plan when the room will be out of use.
  • Keep a written record of discoveries after strip-out.Discuss changes to scope before additional repairs proceed.

From our work

A closer look at our work

Finished details from our own work.Discuss which materials, storage and finishes would suit your refit.

Kitchen renovation in Crystal Palace: title card over a photograph of our own finished work, by South East Build
Finished kitchen with an island and tiled splashback
Full-height painted kitchen cupboards

Talk it through

Start with a call, then a site visit if it helps.

Tell us the postcode, the room's condition and what you want to keep or change.Start with a call about the scope.

Keep exploring

Related work nearby

Further reading

The regulations: the official guidance