Retain, repair or replace · Peckham

Bathroom renovation in Peckham

Design-led: we plan the room before we price the work, so the drawing and the build match.

Build-led: our own builders, plumbers and electricians on site, one team from strip-out to finish.

A worn room does not always need everything replaced.Our bathroom renovation in Peckham starts with its condition, then the changes you want to make.

SE5 · SE15 · SE16 · SE22 · Southwark

Assess the existing room

Bathroom renovation in Peckham: where to start

A fixed service riser may favour keeping the WC in place while renewing the shower and storage.

Check the existing ventilation route before closing new walls.

Agree how water isolation and noisy work affect neighbouring flats.

Bring photographs of problem areas as well as ideas for the finished room.Leaks and damaged surfaces belong in the first brief.

Compare a partial refresh with a full refit.List the repairs and service changes under each option.

Make it buildable

Repairs and replacement in Peckham

Agree the investigation and repair scope before closing walls or tiling.

Confirm which fittings are being reused and who checks their condition.

Keep any unexpected repairs separate from the original refit brief.

The sequence should resolve hidden defects before new fittings, surfaces and decoration go in.

The local check

What changes from one property to another

Southwark's householder guidance is the one to read before you draw anything.

Permitted development does not apply to flats or maisonettes at all, so any external change needs a full application.

A large single-storey rear extension can go ahead under permitted development, with Prior Approval.

That means the council writes to your neighbours first.

In a conservation area, or under an Article 4 direction, those permitted development rights are cut back again.

We check the actual address and the proposed work before saying what consent is needed.

Check the rules for your address

These are the local authority and estate sources relevant to Peckham.

Before work begins

Build a clear refurbishment brief

Keep the visible replacement separate from the repairs that make the room usable for the long term.

  • Record existing leaks, damp and damaged finishes.Agree what needs investigation before selecting replacements.
  • List what stays and who checks its condition.Retained appliances and fittings still need to suit the new arrangement.
  • Identify changes to walls, service routes and outside openings.Check the proposed scope against the property and tenure.
  • Agree the work sequence, temporary facilities and delivery access.Plan when the room will be out of use.
  • Keep a written record of discoveries after strip-out.Discuss changes to scope before additional repairs proceed.

From our work

A closer look at our work

Finished details from our own work.Discuss which materials, storage and finishes would suit your refit.

Bathroom renovation in Peckham: title card over a photograph of our own finished work, by South East Build
Finished bathroom with terrazzo tiles
Fluted basin with fitted vanity storage

Talk it through

Start with a call, then a site visit if it helps.

Tell us the postcode, the room's condition and what you want to keep or change.Start with a call about the scope.

Keep exploring

Related work nearby

Further reading

The regulations: the official guidance